Company Case studies 

PMP Surfacing has completed a range of class-leading projects at some of the biggest attractions in the UK including Chessington World of Adventures, Legoland Windsor Resort, and CBeebies Land at Alton Towers. Our case studies offer a more in-depth look at some of our individual projects, allowing readers to see real-world examples of how our products can be deployed.

Covent Garden CASE STUDY.png

Arc'teryx retail outlet, Covent Garden

PMP Surfacing were appointed to install a specialist internal quartz carpet, for a brand new retail experience for Arc’teryx. The brand is a Canadian performance outdoor equipment and clothing company known for leading innovations in Climbing, Skiing and Alpine technologies.

 

This exciting project involved the use of Vuba Resin products, specifically requested by the retailer for the interior aesthetic they were seeking to create.

Click the image to read and download the. full case study. 

CBeebies Land Hotel  copy.png

Cbeebies Land Hotel, Alton Towers

PMP Surfacing was appointed to carry out the transformation of the Cbeebies Land hotel at Alton Towers. The surface originally installed was worn and tired looking, therefore we called upon to change the look of the hotel. 

 

We used Flexistone and our Colourbound system to acheive the look that the hotel wanted. 

 

Click the image to read and download the full case study.

World of Jumanji  .png

World of Jumanji, Chessington

World of Adventures

Working alongside B and E Entertainments, the brand-new world of Jumanji Land at Chessington World of Adventures opened in May 2023. PMP surfacing installed 3000 m2 of Flexistone and 500 m2 of Flexipave in a major install in the brand new attraction.

Click the image to read and download the full case study.

Bunker Lining Case Study-3 copy.png

Aston Wood Golf Club

PMP was appointed to provide solutions to ongoing bunker issues at Aston Wood Golf Club.

 

Following consultation with the golf club, numerous problems were identified including migration of sand and poor drainage.

The team at PMP Surfacing carried out bunker lining training with the greens install on how to install our Flexibunker system. This club is part of our Golf Partnership program.

Click the image to read and download the full case study.

Legoland Spray Granite CASE STUDY-2 copy.png

Legoland Adventure Golf, Windsor

PMP Surfacing completed a major installation of its Spray Granite product at LEGOLAND Windsor within the brand new adventure golf attraction.

738 m2 of the highly specialist coating was installed in 4 different colours.

 

The attraction was unveiled to the public by professional golfer Charley Hull and has already seen thousands of visitors flock to the park’s latest offering.

Click the image to read and download the full case study.

 All Saints Church Shiptonthorpe CASE STUDY New Design.png

All Saints Church, Shiptonthorpe

PMP Surfacing installed Flexipave into All Saints, Shiptonthorpe Church in York, making the church more accessible and safer to the general public.

 

Our sustainable Flexipave paths were unveiled to the public in July 2023, providing more wheelchair access and an ecofriendly surface that runs throughout the churchyard.

The Flexipave surface had excellent feedback from the church staff and local people who live nearby. 

Click the image to read and download the full case study.

Murrayfield Golf Case Study copy.png

Murrayfield Golf Club

Murrayfield Golf Club is an icon within the city of Edinburgh. With unparalleled views over the beautiful Scottish capital, the course offers everything that golfers love about the game.
 

In spring 2021, PMP Surfacing was invited to look at the resurfacing of numerous sections of the course, including the pathways linking the clubhouse to the 1st tee. We supplied and installed over 1,000 m2 of Flexipave to the golf course over a two year period.

 

Click the image to read and download the full case study.

Mythica Legoland Case Study .png

Legoland Mythica, Windsor

Opened in Summer 2021, Mythica at Legoland Windsor was a brand-new themed area that incorporated three new rides. This was the second project working under B&E Services. 

 

We installed Flexistone along with creating a brand new product for the project; Flexiglass.

Using highly polished coloured glass, PMP was able to create coloured 'veins' that matched the surrounding architecture of the zone. 

Click the image to read and download the full case study. 

Folly Lane Case Study-2 copy.png

Folly Lane, Trans Pennine Trail 

The Folly Lane stretch of the Trans Pennine Trail was an unused bridleway that formed part of the trail that runs through South Yorkshire. 

The steep inclines and surface erosion had left the path unsuitable for horses and walkers due to the unstable nature of the ground. In conjunction with Yorkshire Water, The Trans Pennine Trail appointed PMP to regenerate the Folly Lane stretch using Flexipave. 

Click the image to read and download the full case study. 

Tree Surrounds Case Study PMP Surfacing copy.png

Tree Surrounds 

PMP Surfacing are the leading suppliers of installing Flexipave into tree surrounds.

We have worked closely with Dudley MBC and Amey Construction in Birmingham as the organisations looked to address the issues of tree surrounds. 

Both organisations identified the benefits of KBI Flexipave as the preferred material for new and replacement tree surrounds. This case study shows the benefits of Flexipave as a surface used for tree surrounds. 

 

Click the image to read and download the full case study

Vita York Case Study PMP Surfacing copy.png

Vita York 

Vita York was a hugely ambitious project to create state-of-the-art student living accommodation in this historic Yorkshire city. The project involved new-build construction that needed to integrate sympathetically with a Grade II listed former convent building. 

4,000m2 of Flexistone was laid to all of the site's pedestrian pathways, allowing the free draining of rainwater with a finish that worked with the buildings. In a two month project in 2017 the project was finished ahead of the 2017/18 academic year. 

Click the image to read and download the full case study

Copy of Cycle Routes Case Study.png

Cycle Routes

Flexipave is a perfect surface for Cycling routes.

 

Our company has installed many miles of our Flexipave across all parts of the UK, receiving praise from users for the friendly way that the material feels whilst riding.

 

The use of Flexipave has transformed these routes in to year round facilities.

 

Click the image to read and download the full case study